The document "Building Blocks; a manifesto to transform the Built Environment" published by Architects Declare defines a pre-demolition audit as
"a survey carried out by qualified personnel to determine the quantity of material in a building before its demolition or deconstruction. It helps to identify materials within the building that could be reused or repurposed."
[edit] Introduction
It’s always best, when considering demolishing a building, to ask certain questions before beginning any work – even planning work. The first, and perhaps the biggest, is to ask why you want to demolish the existing site – can it be redeveloped or can elements of the site be kept?
A pre-demolition audit can help answer these questions, along with assessing the materials within the buildings and their potential value. When you have all of this information, that’s when you need to look at whether to refurbish, renovate or demolish.
[edit] So, you have decided to demolish
What will you be doing with all of those materials? Best practice says you should try to reclaim as much waste as possible, and there are four key ways to handle demolition waste reclamation, known as the Four R’s – each with their own advantages:
[edit] Reduce
Are there any areas of the building you can keep? Reducing the amount of waste through not demolishing a part of a building will help you to save time and money through sorting or transportation.
[edit] Reuse
What areas can be reused in their current form? Timber or metal beams, intact fireplaces, heating or electrical systems? If these, and more, can be reused in the new building on the same site, this will help you save on some new build materials cost and will reduce time spent recycling or disposing of materials, saving time in the process.
[edit] Recycle
When materials on your site can’t be reused, can they be recycled? This is taking the materials and using them in a different form, for example taking a timber beam and shredding this, to reform into MDF or a similar material – for use in the new building.
[edit] Recover
This option is often best for teams that aren’t able to go through options 1-3, for example if there’s little time to complete these activities. Recovering materials in essence a means to send all mixed (unsorted) waste materials to a facility, where they will look to reuse or recycle them externally.
The more material that can be dealt with using a mixture of the above options, the greater the chance of saving money through on build costs, selling materials that have been identified as having value, or even just avoiding landfill tax.
This article was created by --BRE Buzz. It was originally published on BRE Buzz in March 2016 and was written by Jo Goodwin, Marketing Manager for BRE SMARTWaste and BRE YellowJacket.
You can see the original article here.
Read more BRE Buzz articles here.
[edit] Related articles on Designing Buildings
- Building Research Establishment.
- BRE articles.
- BRE Trust.
- BREEAM.
- Decommissioning.
- Demolition.
- Design for deconstruction – helping construction unlock the benefits of the circular economy.
- End of life potential.
- Explosives.
- How to conduct a pre-demolition audit.
- Pre-construction information.
- Quantification of construction materials in existing buildings (material intensity).
- Recycling.
- Site waste management plan.
- Sustainable materials.
Featured articles and news
BSRIA Briefing 2024: Sustainable Futures speakers
Redefining Retrofit for Net Zero Living 22 Nov.
Wall of support for post-Grenfell regulation of electricians
Call for a shake-up of the construction industry highlighted on radio.
Digital sustainability through future AEC tools
Bringing together industry and academia to meet challenges.
Skills gap for net zero highlighted to Minister for Industry
ECA convenes roundtable discussion at Portcullis House.
Evidencing Net Zero with the new UK buildings standard
Pilot version with detailed excel proforma out now!
Scottish Building Safety Levy, in consultation
From direct remediation and the RPDT, to the costs and alternatives.
Waves of warmer homes grants for the rental sector
Boosting energy efficiency standards for all rented homes.
A refocus of the National Planning Policy Framework
Key terms described in brief, as the consultation closes the evening of the 24th.
Fortified farmhouses of the unruly 16th-and 17th-century borders.
ECA shares advice for those who may be exposed to risks.
How to revolutionise UK housing with MMC
CIC and Supply Chain Sustainability School unveil a plan.
From the UKs largest manufacturer and supplier of lime.
From mud bricks to smart concrete
A brief history from 7000BC to a future on the moon.
Regulator of Social Housing publishes latest fire safety report
Covering remediation of 11 metre plus social housing sector buildings.
Apartment and Duplex Defects Remediation Bill 2024
Approved for priority drafting by Government of Ireland.
The long list with in the frame of key historical events.
Competence frameworks for sustainability in the built environment
Code of practice, core criteria consultation draft for comment.
New Floods Resilience Taskforce
With a wet met office autumn prediction.